Shafa Al Nahdah – DMC Plant #2
Concrete batching plant · Dubai, U.A.E. · project GPE-DXB-25185 · eWON GPE-Router-018
Showing last values received 19 Nov, 19:23 GST (2 h ago)
Offline
No data since 19 Nov, 19:23 · 19 November 2026 · 21:06 GSTPlant status
Offline
No data since 19 Nov, 19:23
Total produced
17,972.4 m³
Production counter
Produced today
-13.6 m³
7 mixer starts · mixer 8:24 h
Availability
99.9 %
no faults since 08 Nov
Next service
in 488 h
mixer · example interval 500 h
Material levels
Silo 1
10 %level
Silo 2
20 %level
Silo 3
30 %level
Silo 4
40 %level
Aggregate moisture
Bin 1
1.11 %moisture
Bin 2
1.22 %moisture
Bin 3
1.33 %moisture
Bin 4
1.44 %moisture
Bin 5
1.55 %moisture
Current batch
Recipe
Target batches0
Batch size0.00 m³
Mixing time10 s
Discharge time17 s
Last production 19:21 · +1.2 m³
Mixer / productionSICOMA MP1875/1250 · S/N 19873
Mixerstopped
Motor current0 A
Power90 kW
Production today
cumulative since 00:00
mixer running
Recommendations & open items
| Priority | Item | Status | Since |
|---|---|---|---|
| High | No data since 19 Nov 19:23 – VPN not reconnected after VM restart | Open | 19 Nov |
| Info | Documents differ on mixer type (twin-shaft vs. planetary) | Open | 08 Nov |
| Info | Units not defined in the data block | Open | 08 Nov |
Service & history
- 19 Nov 202619:23Connection lost (ongoing)Talk2M · 103 min without data so far
- 19 Nov 202619:21Last batch producedCounter +1.2 m³
- 19 Nov 202618:42Switched to automatic modeCurrent operating mode
- 19 Nov 202610:14Connection lostTalk2M · 4 min without data
- 19 Nov 202609:19Connection restoredData flowing again after 14 h
Documents
PDFWiring diagram GPE-EL-26185PDF · English · 235 KB · 16 Nov 2026
PDFSICOMA mixer service manualPDF · multilingual · 18.5 MB · 16 Nov 2026
Source: DB99 “GPE-Hausable”, VIPA 314-2AG23 via Talk2M / eWON GPE-Router-018 · read-only, polled every 10 s · 9,723 samples since 08 Nov · times in Dubai local time (GST, UTC+4) · units inferred from variable names · service interval = example value